Shoscombe Project: From Concept to Completion

Shoscombe Project: From Concept to Completion

We’re incredibly proud to have supported the delivery of this major infrastructure project for Wessex Water YTL in Shoscombe, which will help improve water quality and increase storm storage to reduce environmental spills into the Wellow Brook River in the Radstock Region.

From the initial concept in February 2024 right through to delivery in March 2025, BWC has been involved every step of the way, supplying:

🔹 Design and build of a 6.8 metre long control panel
🔹 Custom steel frame infrastructure
🔹 Full scaffolding design and install
🔹 A 9-metre-long flat pack kiosk, constructed on site
🔹 All associated building services

Ordinarily, we would build everything off-site under a factory-built solution (FBS) however due to tight access restrictions, this wasn’t possible. With a width restriction of 2.5 metres , BWC rose to the challenge of offering a different solution, building the steel frame & kiosk in modular fashion constructed on-site!

This has been a collaborative, challenging, and highly rewarding project, demonstrating the very best in control engineering, bespoke fabrication, and water industry innovation.

A huge thanks to everyone involved — and best of luck to the internal YTL Construction Team as they take the next steps forward 👷‍♂️💪

Share the Post:

Recent Posts

View our news page for the latest stories, announcements, people profiles and press releases.

East Coker – Mains Distribution Unit

BWC successfully designed, manufactured, tested and installed a new 200kVA mains distribution unit (MDU) for East Coker, forming part of a wider scheme to improve…

Mains Distribution Units – Wessex Water AMP8

BWC designed and manufactured another set of Mains Distribution Units (MDUs), ready to support future upgrade sites as part of Wessex Water’s AMP8 infrastructure investment…

All Cannings – 10 Metre FBS Unit Installation

Careful planning and coordination were essential for the successful delivery and installation of this 10-metre-long FBS unit in All Cannings, one of the largest projects…

Sewage Pumping Station – MCC Upgrade

BWC successfully completed another sewage pumping station upgrade for one of our valued water industry clients, helping improve the reliability and control of this critical…

Bournemouth Pumping Station Upgrade

Working as Principal Contractor, BWC has successfully completed a major pumping station upgrade for Wessex Water in Bournemouth, delivered across a challenging six-week programme. The…

Sewage Pumping Station Successfully Delivered

Another Sewage Pumping Station Successfully Delivered We’ve recently completed another pumping station upgrade — a project that truly highlights our full end-to-end MEICA capability. Our…