BWC

All Cannings – 10 Metre FBS Unit Installation

Careful planning and coordination were essential for the successful delivery and installation of this 10-metre-long FBS unit in All Cannings, one of the largest projects completed by our team in recent months.

Access to the site presented a significant challenge, with tight passageways and narrow farm roads requiring every stage of the delivery and installation to be carefully managed.

Working alongside KRG Transport Ltd for the specialist delivery and Dan’s Engineering Ltd, who fabricated the supporting frame, the unit was safely transported from our Bridgwater facility and successfully positioned on site.

The project demonstrates the benefits of off-site manufacture for complex infrastructure projects, allowing more work to be completed within a controlled environment before delivery. This helps reduce time spent on site, improve safety and minimise disruption during installation.

From manufacture through to final placement, the All Cannings project is another example of BWC delivering large-scale engineering solutions in challenging site conditions.

Share the Post:

Recent Posts

View our news page for the latest stories, announcements, people profiles and press releases.

East Coker – Mains Distribution Unit

BWC successfully designed, manufactured, tested and installed a new 200kVA mains distribution unit (MDU) for East Coker, forming part of a wider scheme to improve…

Mains Distribution Units – Wessex Water AMP8

BWC designed and manufactured another set of Mains Distribution Units (MDUs), ready to support future upgrade sites as part of Wessex Water’s AMP8 infrastructure investment…

All Cannings – 10 Metre FBS Unit Installation

Careful planning and coordination were essential for the successful delivery and installation of this 10-metre-long FBS unit in All Cannings, one of the largest projects…

Sewage Pumping Station – MCC Upgrade

BWC successfully completed another sewage pumping station upgrade for one of our valued water industry clients, helping improve the reliability and control of this critical…

Bournemouth Pumping Station Upgrade

Working as Principal Contractor, BWC has successfully completed a major pumping station upgrade for Wessex Water in Bournemouth, delivered across a challenging six-week programme. The…

Sewage Pumping Station Successfully Delivered

Another Sewage Pumping Station Successfully Delivered We’ve recently completed another pumping station upgrade — a project that truly highlights our full end-to-end MEICA capability. Our…