BWC successfully completed another sewage pumping station upgrade for one of our valued water industry clients, helping improve the reliability and control of this critical infrastructure.
The project involved the full design, manufacture and factory testing of a new Form 4 Duty, Standby & Assist Motor Control Centre (MCC), complete with PLC control and telemetry integration.
Maintaining site operations throughout the works was a key consideration. Our team installed a temporary generator solution and managed the Distribution Network Operator (DNO) temporary diversion, allowing the new MCC and kiosk to be safely installed, tested and commissioned with minimal disruption.
From initial design and manufacture through to installation and commissioning, the project demonstrates BWC’s ability to carefully plan and deliver complex MEICA and control system upgrades while maintaining operational continuity at critical water infrastructure sites.