BWC

Sewage Pumping Station Successfully Delivered

Another Sewage Pumping Station Successfully Delivered

We’ve recently completed another pumping station upgrade — a project that truly highlights our full end-to-end MEICA capability.

Our engineering team designed, manufactured, and fully factory-acceptance tested a Form 4 pump & macerator panel, ensuring it arrived to site fully compliant, fully proven, and ready for seamless integration.

This upgrade required precision, planning, and a steady hand. The site team excelled on all fronts:

✔️ Safely positioned the new MCC, navigating around large existing pumps and tight working constraints.
✔️ Installed replacement containment and new field wiring, ensuring every element met current standards.
✔️ Completed a full cabling upgrade, with clean routing and future-friendly organisation.
✔️ Maintained full pumping station functionality throughout, ensuring the process never stopped — even while critical improvements were underway.

Operating within a live environment is always a challenge, but the team delivered the entire installation within a week while upholding the site’s operational continuity and safety.

This project is a clear example of how strong design, rigorous testing, and skilled on-site delivery come together to modernise essential infrastructure with zero disruption.

Share the Post:

Recent Posts

View our news page for the latest stories, announcements, people profiles and press releases.

East Coker – Mains Distribution Unit

BWC successfully designed, manufactured, tested and installed a new 200kVA mains distribution unit (MDU) for East Coker, forming part of a wider scheme to improve…

Mains Distribution Units – Wessex Water AMP8

BWC designed and manufactured another set of Mains Distribution Units (MDUs), ready to support future upgrade sites as part of Wessex Water’s AMP8 infrastructure investment…

All Cannings – 10 Metre FBS Unit Installation

Careful planning and coordination were essential for the successful delivery and installation of this 10-metre-long FBS unit in All Cannings, one of the largest projects…

Sewage Pumping Station – MCC Upgrade

BWC successfully completed another sewage pumping station upgrade for one of our valued water industry clients, helping improve the reliability and control of this critical…

Bournemouth Pumping Station Upgrade

Working as Principal Contractor, BWC has successfully completed a major pumping station upgrade for Wessex Water in Bournemouth, delivered across a challenging six-week programme. The…

Sewage Pumping Station Successfully Delivered

Another Sewage Pumping Station Successfully Delivered We’ve recently completed another pumping station upgrade — a project that truly highlights our full end-to-end MEICA capability. Our…